DFW Airport APM Soffit Project

PMC installed approximately five miles of aluminum metal panels to cover the bottom of the new Automated People Mover (APM) elevated train track in association with Hensel Phelps. Work consisted of closing the void space between columns, beams, and girders in the elevated APM. Work heights ranged from 45 to 67 feet above grade. Aluminum panels are continuous with several access door openings for maintenance. Coordination with traffic control was critical as work progressed above the roadways.
