DFW Airport Parking Lot Rehab

A new concrete bus lane was constructed at the South Remote Parking Lot. Repairs to the existing asphalt surfacing and crack sealing was accomplished in preparation for a complete FOG seal and restriping of the entire parking lot. The Employee Parking Lots 5E & 6E had a bus turn around lane constructed which included manipulation of part of the existing roadway. Repairs were made to both existing concrete and asphalt surfaces with special attention to restoring substrates that had failed. The entire surface was refurbished and restriped.
