RUTHMEADE PARK

This project consisted of installing all play structures, benches, trash receptacles, and required drainage rock, and all engineered wood fiber. PMC removed all existing concrete, including sidewalks and reinforced edges. We also installed new concrete paving and sidewalks and performed the necessary grading to achieve desired elevations for the ADA ramp, sidewalks, and reinforced edges.
